第14回
廃止措置中の浜岡 1 号機を活用した研究について(その3)
著者:
熊野 秀樹,Hideki YUYA,横倉 一洋,Kazuhiro YOKOKURA
発刊日:
公開日:
キーワードタグ:
An investigation of RPV and concrete structure in Hamaoka unit-1 have been started since 2014. Objective of the investigation is to contribute to the optimization of plant maintenance methodology by development of maintenance technologies such as non-destructive inspection and small specimen technique. This report describes some results obtained at present. ...
英字タイトル:
Status of the research using materials in decommissioning Hamaoka NPS Unit 1 (3)
第13回
浜岡 1,2 号機の廃止措置状況と研究について(その2)
著者:
横倉 一洋,Kazuhiro YOKOKURA,熊野 秀樹,Hideki YUYA
発刊日:
公開日:
キーワードタグ:
Hamaoka Nuclear Power Station Unit 1 and 2 have already started the plant decommissioning since November, 2009. The decommissioning Stage-1 (preparation stage) had been already finished and now Stage-2 (Dismantling stage of Reactor Zone Peripheral facilities) is in progress. We have begun a research about material degradation by using some pieces of concrete and metal taken from Unit 1. This report describes the project scheme of the research. ...
英字タイトル:
Project Status of Decommissioning and Research Hamaoka NPS Unit 1 and 2 (2)